Millman: Murray Bridge trip – it’s a wrap

Good morning
The three of us arrived home on Monday 12.30pm safe and sound, only a flat tyre on Old Mort 30kms from Collie, apart from the normal oil leaks on a Model A both vehicles performed quite well. Both vehicles will require some electrical work before another long run, Nellie Fordor requires a complete re wire and Old Mort needs wiring upgrade.
Sue and Anne did a wonderful job of driving over 2,500kms averaging 360kms per day (although Sue did all the driving and Anne listening for any strange noises) it was quite an achievement. I must say it is a concern having to worry about looking after two 90 year old vehicles and getting two ladies home.
An update on total funds raised including online and donations collected along the trip was $1441.93 thanks to all those generous people who donated to this worthy cause.
Regards
Anne and Wayne

Wayne’s Motor Neuron Disease fundraising page

This entry was posted in Murray Bridge 2018. Bookmark the permalink.

One Response to Millman: Murray Bridge trip – it’s a wrap

  1. John & Helen Moorehead says:

    Welcome Home Anne & Wayne
    Pleased to hear all went well with only minor problems . Thank you for the reports along the way, Helen and I enjoyed the comments. All the best to Sue and Neville after a sad couple of weeks and a great effort by Sue and Anne in getting the Model A ‘s home.

    Fond memories of our times at the National Meets.
    Regards

    John & Helen M

Leave a Reply

Your email address will not be published. Required fields are marked *